High Meadows Water Main Replacement

Location: Black Hawk, SD
Completion Date: Winter 2024
Client: High Meadows Water Association
Scope of Work: Installation of over 8,200’ of 4” water main

Lidel Construction tackled the replacement of an aging water main in Black Hawk, SD, ensuring a more reliable water supply for the community. The existing system had a high leakage rate, wasting valuable drinking water. Our team installed a new HDPE fusible pipe system, using specialized rock trenchers to navigate the rocky terrain efficiently. The result was a more sustainable and efficient water distribution system, reducing water waste and improving service reliability for local residents.

Previous
Previous

Mills Creek Addition